Offshore Floating Production
Page 275
Index
- adjudication –,
- arbitration –
- arrest and/or detention –, –,
- assignment (of contractual burdens) –, , , ,
- Basel Convention on the Control of Transboundary Movements of Hazardous Wastes and their Disposal, The –,
- CAPEX/OPEX –,
- centre of gravity (COG) –,
- charterparties
- “conditions of use” agreements –
- construction contracts
- contractual interpretation
- Convention on the Prevention of Marine Pollution by Dumping of Wastes and Other Matter 1972 (the “London Convention”), The –
- Convention for the Protection of the Marine Environment of the North-East Atlantic (“OSPAR Convention”), The –
- conversion contracts
- acquisition of vessel for –
- carry-over agreements –
- commissioning –
- delivery of vessel to yard –
- design process –
- disputes –
- vs. newbuild projects –
- pricing of –
- redelivery and sailaway
- reimbursable work –
- remeasurable work –
- target sum pricing –
- termination rights –
- unit rates –
- unpriced scope
- work process –
- see also fitness for purpose
- day rates –, –
- decarbonisation –, , ,
- decommissioning –
- defects
- case study concerning –
- compensation for
- design defects
Page 276
- insurance for , , , , –
- late discovery of , ,
- notice of –
- rectification of –, , , , , ,
- termination for –
- delay
- bad weather –
- case study (conversion) –
- charter delay ,
- concurrent delay –,
- damages for , , , , –, –, , –, –
- “delay in start-up” insurance –
- design changes , , , , –
- in invoice submission
- notification of –
- in production commencement
- in sub-contracts –,
- termination for delay , –
- to vessel arrival –, –, –, –
- see also liquidated damages
- demurrage –,
- design development process –
- design disputes , –, –
- design integration –
- design responsibility –,
- detention and/or arrest –, –,
- duty of good faith , –
- EU Waste Shipment Regulations 1013/2006 –
- expert determination , –,
- FEED (Front End Engineering Design) , –, –
- fitness for purpose , –, –, ,
- flaring –, –, , , , ,
- FLNG –, , ,
- fluid transfer systems –
- force majeure , , , –, ,
- FPSO units
- advantages and disadvantages of –
- contract structures , –
- definition –
- design and construction , –
- historical development of –
- installation and acceptance
- jackups and bottom-fixed platforms –, –
- late arrival –
- mobile production unit types –
- operational efficiency of
- power generation onboard
- production –
- production difficulties –
- regulatory compliance
- semi-submersibles –, –
- Sevan type –, –
- spar , –
- sub-contracting –
- tension leg platforms –, –
- testing of
- FSRUs (Floating, Storage and Regasification Units) , –
- gas compression and treatment , , , , –
- guarantees
- hire , ,
- Hong Kong International Convention for the Safe and Environmentally Sound Recycling of Ships, The –
- hydrogen , ,
- indemnities –
- for consequential loss –, – (see also “conditions of use” agreements)
- for demurrage –
- force majeure
- for gross negligence and wilful misconduct –
- intellectual property –,
- interpretation of indemnity clauses (see also knock-for-knock)
- personal injury/loss to life –
- pollution –
- property damage –
- third party claims –
- insurance
- business interruption/loss of production income policies –
- construction all risks (CAR/WELCAR) policies –
- delay in start-up policies –
- exclusion from
- FPSO/property insurance –
- freight, demurrage and defence insurance
- hull and machinery –
- kidnap and ransom
- loss of hire
- operational liabilities
- operators’ extra expense/energy exploration and development/control of well policies –
- protection and indemnity insurance/specialist operations –
- strike insurance
- upgrades, life extension works and/or modifications –
- war risks
-
Page 277
- invoicing –
- knock-for-knock , , , , ,
- liability
- liens ,
- limitation of liability
- liquidated damages , –
- litigation (English High Court) –
- local regulations, compliance with –, , –,
- logic contracts , ,
- LPG
- maintenance allowance –, –
- malus , , ,
- mediation –, , ,
- mooring systems
- changes to
- commissioning phase of
- design of , –
- development of technologies –
- disconnectable mooring systems ,
- expense of
- functions of –
- intellectual property in
- limits on excursions
- location of ,
- mooring methods
- operation of
- removal from field ,
- spread mooring , , ,
- tandem mooring –,
- turrets , , –
- weathervaning , –, , ,
- mortgages , –, ,
- non-payment claims –
- novation –, ,
- offloading/offtake –, –, , –
- capability , –
- DES sales
- equipment –
- FOB/CIF sales
- key considerations –
- LPG and LNG offloading –
- offtake vessels –
- performance –,
- problems –
- production targets –
- quality –
- via remote loading buoy
- responsibility for operations , –
- scheduling –
- short-loading –
- from spread-moored FPSO –
- suspension of offloading –
- to tanker
- tests
- from weathervaning FPSO –
- oilfields
- operation and maintenance (O&M) contracts , –, , , ,
- Petroleum Act 1998, The , –
- pollution , , –, , , , –
- preliminary design work –, –, , , –, –,
- purchase options , –
- reservoir characteristics , ,
- sailaway , , –
- Ship Recycling Regulation 1257/2013 , –
- stand-by rate , , , , –,
- subcontracting , –, ,
- terminal conditions of use (COU) ,
- termination –
- case studies –
- of charterparty –, , , –, ,
- common law rights of –
- for convenience –
- of conversion contracts –
- for default –
- for delay , –, –, ,
- disadvantages of –
- effect on other contractual terms –
- express rights of –
- for force majeure ,
- of IP licence
- for late arrival –
- loss/retention of termination rights , ,
- other effects of –
- for production difficulties –
- and redelivery
- restriction on termination rights –
- see also duty of good faith
- tiered dispute resolution options –
- topsides
- turn-key obligations under charter ,
- United Nations Convention on the Law of the Sea (UNCLOS) –
- variations to contract –, –
- additional consequences of –
- case study –
- change order documents –
- clauses –
- in construction contracts
- in conversion contracts , , –
- disputes –
- entitlement to make a change –
- entitlement to suspend work pending design re-assessment –
- mechanism –, ,
- negative variation orders
- other types of variations –
- post-delivery variations –
- preferential design changes –
- pricing of –, –
- time limits , –, –
- variation orders ,
- variation proposals –, –
- variation requests –
- warranties
- Waste Framework Directive 2008 –
- water injection , , , , , ,
- wind farms , ,