Practical Guide to Engineering Procurement and Construction Contracts
Page 151
Index
Index
- acceleration, constructive –
- acceptance of work: as Owner obligation –
- accounting: in Joint Venture –, –
- advance payment
- approvals: as Owner obligation
- archaeological items
- automobile liability insurance
- award criteria
- Basic Design and Engineering Package (BDEP)
- BDEP see Basic Design and Engineering Package (BDEP)
- bias: in dispute causes ;
- cap on liability
- causal connection, in claims –
- change control: in contract management
- change valuation –
- choice of law: Joint Ventures and ,
- claim(s): anticipation ;
- collaboration –
- conceptual design –
- concurrent delay –;
- see also delay
- confidentiality: Joint Ventures and –, –
- consequential changes
- consequential or indirect damages
- Consortium: expulsion from ;
- construction/erection all risks insurance ,
- construction management: daily tasks of ;
- Construction Program Manual (CPM)
- constructive acceleration –
- constructive changes
- contract conditions –, , , –;
- contract management: change valuation and –;
- claims management in –;
- consequential changes and ;
- constructive acceleration and –;
- constructive changes and ;
- Contractor-ordered changes and ;
- defective specifications and ;
- defects and –;
- documentation control in –;
- entitlement preservation and –;
- information supply and ;
- notices and –;
- over-inspection and ;
- Owner-ordered changes and –;
- Owner-provided defective materials or property and –;
- plans and procedures in ;
- program –;
- purpose of –;
- records in –;
- and rejection of conforming work ;
- schedule control in ;
- third party changes and ;
- variation orders and –
- Contractor: in contract tendering and negotiation –
- contract review
- contract tendering and negotiation: award criteria in ;
- Contractor in –;
-
Page 152
- liabilities in –;
- Owner in –;
- science of –;
- warranties in –
- contractual exclusions
- cooperation
- cost control
- damage: as dispute cause –;
- damages: for delay, liquidated ;
- defect(s): contract management and –;
- defective specifications
- Defects Liability Period –,
- delay: delay-causing events –;
- design: complexities of ;
- Design Brief
- dispute causes –;
- dispute resolution
- documentation control –
- drawings: as Owner obligation
- due diligence: decision-making after, in project conception –
- duty of non-interference –
- Employer’s Requirements: conceptual design in –;
- entitlement preservation –
- environmental protection –
- EOT see extension of time (EOT)
- equipment: Ownership of ;
- exchange rates
- exclusions: in contract tendering and negotiation ;
- experience
- expulsion: from Joint Venture –
- extension of time (EOT)
- facility requirements
- feasibility study –
- FEED see Front-End Engineering and Design (FEED)
- Final Acceptance –,
- financing: in Joint Venture
- fixed price contract –
- Flyvbjerg, Bent , , ,
- Force Majeure
- forward contract
- fossils
- Front-End Engineering and Design (FEED) , ,
- Health, Safety and Environment (HSE) ;
- see also safety
- hold harmless –
- HSE see Health, Safety and Environment (HSE)
- information: as Owner obligation
- information supply: as dispute cause –
- innovation
- inspection: joint ;
- instructions: as Owner obligation
- insurance: construction/erection all risks ;
- invoicing: in Joint Venture ,
- joint inspection
- Joint Venture (JV): accounting in –, –;
- arbitration and –, –;
- choice of law with , ;
- claims and –, –;
-
Page 153
- Consortium vs. –;
- continuation of ;
- contributions of members to ;
- dispute resolution and –, –;
- effective date of ;
- exclusivity with ;
- expulsion from –, –;
- financial plans of –;
- financials in –, –;
- financing in , ;
- formation of –;
- insurance in –, –;
- invoicing in , ;
- liability and , –, –;
- management structure of –;
- offer by , –;
- payments in , –;
- principles of joint operation in –;
- profit and loss sharing in ;
- project management in –, –;
- reasons for forming ;
- securities in –, ;
- steering committee in –, –;
- strategic management in ;
- taxes and , ;
- termination of , –;
- unpaid working capital in , ;
- use of property and
- JV see Joint Venture (JV)
- labour shortage
- late payments –
- L/C see letter of credit (L/C)
- letter of credit (L/C) –,
- liability: Consortium and ;
- liability insurance
- loss of profit, loss of use
- lump sum pricing –,
- marine cargo/transportation insurance ,
- materials: Ownership of ;
- method of performance changes
- milestone payments
- mineral deposits
- mutual hold harmless –
- optimism
- option contract: exchange rates in
- overall liability cap
- over-inspection
- Owner: changes ordered by –;
- Owner’s obligations: acceptance of work as –;
- Owner’s risks
- particular requirements
- payment: advance ;
- penalties: liquidated damages vs.
- performance measurement
- performance tests –
- permits: as Owner obligation
- physical conditions, unforeseeable –
- Planning Fallacy
- plant: Ownership of ;
- political bias , ,
- price: as dispute cause –;
- procurement, project
- project conception: cooperation in ;
- project management: in Joint Venture –, –
-
Page 154
- public convenience
- public utilities
- Punch List
- purchase conditions
- recordkeeping –
- Reference Class Forecasting –, –, –
- rely-upon information
- requirements: facility ;
- Ruskin, John
- safety: in construction –;
- see also Health, Safety and Environment (HSE)
- schedule control: in contract management
- scope of work: as dispute cause –;
- securities: in Joint Venture/Consortium –,
- sequential delay –;
- see also delay
- setting out –
- shipping responsibility
- site access: as dispute source –;
- software issues
- specifications, defective
- standardisation
- start date: as Owner obligation –
- storage responsibility
- strikes
- subcontract: conditions –;
- subcontractor warranties –
- substitution: expulsion by ,