JCT Contract Administration
Page 233
Index
Index
- acceleration , , ,
- accepted defects
- additions (variations) , , , ,
- adjudication (in disputes) , , , , , , , , , , , –,
- Administrator (in liquidations) ,
- advance payment , , , ,
- advance payment bond ,
- all risks (insurance) , , , ,
- approximate estimate , ,
- approximate quantities , , , , , ,
- arbitration , , , , –, . , , , , , –,
- architect's satisfaction ,
- arithmetical check
- articles of agreement , ,
- assignment
- attendance claims
- averaging (of insurance claim) ,
- back-to-back (contract terms) , ,
- balance of adjustable work
- bankruptcy , , ,
- base date –
- battle of the forms ,
- BIM Protocol , , , ,
- binding resolution (of disputes) , ,
- brief (from client) , , , , ,
- buildability , ,
- builders quantities ,
- building information modelling , , –
- building regulations , , ,
- building standards , ,
- building surveyor(s) , , ,
- business risk insurance
- cash flow , , , , ,
- caveat emptor (in buying buildings)
- CDP Analysis ,
- chain of liability , , ,
- changes (variations) , , ,
- CIMAR (Construction Industry Model Arbitration Rules) ,
- CIS (Construction Industry Tax Deduction Scheme)
- civil engineer
- claims (contractual) , , , , , , , , Chapter
- claims made (basis for insurance)
- clerk(s) of works , , ,
- Code of Practice for testing work , ,
-
Page 234
- competent person in charge
- completion bill (of quantities in liquidations)
- completion date , , –, –, ,
- conceptual design
- conciliation , ,
- concurrent delay ,
- concurrent expense ,
- conditions of contract , , ,
- consensual resolution (of disputes)
- consideration , , , , , , ,
- Construction Act , , , , , , , , , , , , , , Chapter , , , , ,
- CDM (Construction Design and Management Regulations) ,
- construction management , , , , , ,
- consultant architect , , , , , ,
- contra proferentum (interpretation of indemnity clauses)
- contract bills of quantities , , ,
- contract document , ,
- contract drawings , ,
- Contract Particulars , , –, –, , , , , , , , , , , –, , , , ,
- contract specification
- contract sum , , , , , , , , , , , , , , , , , , , , , , , , , , , , ,
- contract sum analysis (CSA) , , , , ,
- contractor designed portion (CDP) , , , , , , , , , , , ,
- contractor's proposals , , , , , , , , ,
- core (tests)
- cost plan (cost planning) , ,
- cost reimbursement , , ,
- cover pricing ,
- creditors , , , ,
- critical path
- CSCS (Construction Skills Certification Scheme)
- cube test(s) , , ,
- date for completion , , –, , ,
- date of possession ,
- daywork(s) , , , , ,
- deed (contracts) , , ,
- default (of parties to contract) , , , , , , , , , , , , , ,
- defect(s) , , , , , , , , , , , –, , , , , , , , , ,
- defective work , , , , , ,
- deferment ,
- deferred (possession)
- defined work , ,
- delay(s) , , , , , –, –, –, , , , , , , , , , , , , , ,
- delay notice
- design, manage and construct , , ,
- detailed design , , , , , , , , ,
- discounted cash flow , ,
- dispute prevention mechanisms
- disputes adviser
- disputes board
- disturbance (of regular progress) , ,
- domestic subcontractor
- drawing and specification contracts , ,
- due date , , , –, , ,
- due diligence , ,
- early use , , ,
-
Page 235
- electronic data exchange (in BIM)
- elemental cost breakdown
- elemental format (of final account)
- employer's final statement , ,
- employer's requirements , , , , , , , , , , , , , , , , ,
- end-point financing
- errors , , , , –, ,
- estimated prime cost (EPC) , , , ,
- estimating , ,
- ex-gratia claims
- exclude individuals (from works) ,
- existing structure ,
- expert determination (of disputes) –
- express terms , , , ,
- extension contracts –,
- extension(s) of time , , , , , –, , , , , , , , ,
- facilities management ,
- factor cost , , , , , , , , ,
- fair assessment
- fair valuation , , , ,
- fast-tracking
- federated model (in BIM) ,
- final adjustment ,
- final certificate , , , , , ,
- final account Chapter , , , , , , , , , , , ,
- final date for payment , , –, ,
- final payment , , , , , , , ,
- final statement , ,
- financial adjustment ,
- financial statement
- fixed fee , ,
- fluctuations Chapter , , , ,
- form of tender
- formula fluctuations , ,
- framework agreement , ,
- FRI lease (full repairing and insuring lease) ,
- front load(ing) , ,
- frustration
- fundamental breach (of contract) –
- implied term(s) , , , ,
- indemnity Chapter 9, specifically –
- index, indices for price adjustment ,
- information management (in BIM) , ,
- information requirements (in BIM) , , , , ,
- insolvency Chapter , , , , , , , ,
- Insolvency Act , , ,
- instructions , , , , , , , , , , , , , ,
- insurance Chapter , , , , , , , , , , , , , , , , , , , , , , ,
- interest charges ,
- interim application (for payment)
- interim certificate(s) , , –, , ,
- interim payment(s) Chapter , , , , , , , , , , , , , ,
- interim valuation(s) , , , ,
- invitation(s) , , –, ,
-
Page 236
- latent defects , , , , , , ,
- letter of acceptance
- levels of detail (in BIM) ,
- life-cycle costs
- limitation period
- limitation of liability (clauses in material supply contracts)
- Limited Liability Partnerships Act
- liquidated damages , , , , , , , , , , , , ,
- liquidation , , –, –, ,
- litigation , , –,
- local authority/local authorities , ,
- loss adjustment
- loss and expense , , , , , –, , ,
- loss of profit , , , , , ,
- lump sum , , , , , , , , , , , , , , , , ,
- making good defects ,
- management contracting , , ,
- materials off site , , ,
- materials on site , , , ,
- measured term contract(s) , , , , ,
- measurement and valuation , , , , , ,
- mediation , , , –, , ,
- most economically advantageous tender (MEAT) , ,
- mutual dealing (in liquidations) , ,
- named sub-contractor , , ,
- negligence , , , , , , ,
- negotiated contract , , , , ,
- negotiating claims
- negotiation , , –, , , , , , , , , , ,
- neutral evaluation ,
- New Rules of Measurement (NRM) , , , ,
- no negligence (insurance)
- nominated sub-contractor , ,
- notional account (in liquidations) ,
- notional cost(s) , , ,
- notional quantities (with measured term contracts) ,
- novated sub-contractor
- novation (in liquidations) , ,
- novation (of designers) , , ,
- off-site overheads , , ,
- off-site payment bonds , ,
- omissions , , ,
- on-demand bond , ,
- on-site overheads ,
- open book (negotiation) , , , , ,
- open tender
- ordering of materials (in claims)
- outline design ,
- owner (of building) , , , –, , , , ,
- ownership of materials , , , , , ,
- parametric (modelling of building work)
- parent company guarantee
- parity of tendering , ,
- partial possession , , ,
- partnering , , , , , , , ,
- partners (in partnering)
- partners (business)
- partnership(s) (business) , ,
- pay less notice , , , , , , ,
- pay when certified (terms in contracts) , ,
- pay when paid (terms in contracts)
-
Page 237
- performance specification , , ,
- permitted purpose (in BIM) ,
- personal injury (insurance) ,
- photographs
- planning permission , ,
- post-contract , , , , , , , , , , ,
- post-tender checks , , ,
- postponement
- Practical Completion , , , –, , , , , , , ,
- pre-tender checks , ,
- preambles ,
- preferred bidding , ,
- preliminaries (preliminary items) , , , , , –, , , , , , , , , , , ,
- price manipulation ,
- price ringing ,
- prime cost , , , , ,
- private finance initiative (PFI) , , , , , ,
- pro-rata rates , , ,
- procurement Chapters 1 and , , , , , , , ,
- professional (expert) client , , ,
- professional indemnity insurance (PII) , , , , ,
- project agreement (in BIM)
- project manager ,
- property damage/damage to property (insurance) , , , ,
- provisional sum(s) , , , , , , , , , , , , ,
- public liability insurance
- pure design and build , , , ,
- re-measurement
- re-rating , ,
- rectification period , , , ,
- reductions , , ,
- relevant event(s) –, ,
- relevant matter(s) , ,
- relevant omission
- remoteness of damages
- removal of work ,
- rescission ,
- reservation of title (building materials on/off site) , , , ,
- retention , , , , , , , , –, , ,
- retention bond , , , ,
- reverse auctioning ,
- Schedule 2 (variation/change) , , , , , ,
- Schedule 2 (acceleration) ,
- Schedule 2 (named sub-contractor) ,
- schedule(s) of rates , , , , , , , , , , ,
- scheme for construction contracts , , , , ,
- seasonal effect
- sectional completion ,
- selective tendering , , , , , , ,
- self-employed (sub-contractors)
- serial tendering –,
- services engineer(s) , , , ,
- set-off , , –, , ,
- shoe stepping (in taking action for latent defects)
- single tender , ,
- site minutes
- site overhead(s) , , , , , , , , , , ,
- site survey(s) ,
- slump tests ,
- snagging (defects) , , , , , ,
- soil investigations
- soil reports
- Special Project Vehicle(s) ,
- specialists (contractors) , , –, , –, , , , , , , , , , , ,
-
Page 238
- specified default
- specified peril , , , , , , ,
- speculative pricing , , ,
- stage payment(s) , , , , ,
- standing list –
- statutory adjudication , , ,
- statutory insurance
- statutory requirements ,
- strategic partnering , ,
- structural engineer(s) , , –
- subrogation , , ,
- substitution
- suspend performance (under Construction Act) ,
- taking off , , ,
- target cost –
- technical check
- tenant , , , , –, , , ,
- tender type(s) ,
- tender adjudication
- tender documents , , –, , –, , , ,
- tender drawings ,
- tender ratio , ,
- tender report
- terrorism/terrorist acts ,
- tests , , , , , , , ,
- Third Party Rights Act , ,
- time-barred (action for redress for latent defects) ,
- tort , , , , ,
- trade contractor ,
- traditional contracting
- traditional fluctuations ,
- transfer payment
- transparency , ,
- two stage tendering , –, ,
- undefined work ,
- uneconomic use of labour/working of labour , , ,
- uneconomic use of plant ,
- uneconomic ordering of materials ,